| Specification |
Layers: Multi-Layer;
Usage: Dust-Proof Workshop, Electrostatic Workshop, Food And Chemical Industry, Heavy Industry, High-Voltage Power Plant, Research Facility, Specialized Workshop, Textile And Electronic Processing, Warehouse;
Layers: Multi-Layer;
Usage: Dust-Proof Workshop, Electrostatic Workshop, Food and Chemical Industry, Heavy Industry, High-Voltage Power Plant, Research Facility, Specialized Workshop, Textile and Electronic Processing, Warehouse, Dust-Proof Workshop, Electrostatic Workshop, Food and Chemical Industry, Heavy Industry, High-Voltage Power Plant, Research Facility, Specialized Workshop, Textile and Electronic Processing, Warehouse, Dormitories, Temporary Offices, Workshop, Hangar;
Material: Steel Structure;
Customized: Customized;
Application: Warehouse, Workshop, Shed, Hangar;
Life Time: >30 Years;
Surface Treatment: Painting and Hot DIP Galvanize;
Cladding Material: Steel Color Sheets/Sandwich Panels;
Connection Form: Bolt Connection;
Main Steel Frame: H Steel, Z or C Purlin;
Design Parameter: Wind Load, Snow Load and Earthquake;
Service: Design, Engineering, Erection;
Size: According to Customer Requirement;
Doors: Aluminium Alloy or Roller Shutter;
Window: Aluminium Alloy, UPVC Window;
Gutter: Colored Steel, Stainless Steel Gutter;
Downspouts: PVC;
|
After-sales Service: 10 Years;
Layers: Double-Layer;
Usage: Warehouse;
Surface Treatmen: Painting or Hot DIP Galvanized;
Tolerance: +-2mm;
Lead Time: 30 Days;
Insulation: Polyurethane, Rockwool, Glasswool, EPS;
Accessories: Aluminum Window, Man Door, Rolling Door, Daylight;
Wind Load: 285 Km/Hour 180 Miles/Hour;
Snow Load: 10-100 Kg/Sqm;
Loading Port: Qingdao;
Application: Steel Warehouse;
Warranty: 20 Years;
Type: Light Section Steel;
Standard: AISI, BS, ASTM, JIS, DIN, GB;
Forming: Hot-Rolled Steel;
Connection Form: Bolt Connection;
Type of Steel for Building Structure: High-Strength Steel;
|
Usage: Warehouse, Villa, Dormitories, Temporary Offices, Workshop, Office;
Surface Treatment: Painting or Hot DIP Galvanized;
Life Span: Min.50 Years;
Wind Load: 285km/H 180m/S;
Snow Load: 10-100kg/Sqm;
Seismic Load: Level 7;
Roof Slope: 10-40%;
Wall & Roof: Single Metal Sheet/ Thermal Insulation;
Design Service: Auto CAD, Tekla, Bkbm, Solidworks;
Door: Sliding Door/ Auto Uprolling Door;
Window: Aluminum Alloy/ Plastic Steel;
Tolerance: +-2mm;
Lead Time: 30 Days;
Insulation: EPS, Glasswool, Rockwool, Polyurethane;
Material: Steel Structure;
Customized: Customized;
After-sales Service: 24 Hours Around Clock;
Warranty: 10 Years;
|
Usage: Warehouse, Villa, Dormitories, Temporary Offices, Workshop, Office;
Surface Treatment: Painting or Hot DIP Galvanized;
Life Span: Min.50 Years;
Wind Load: 285km/H 180m/S;
Snow Load: 10-100kg/Sqm;
Seismic Load: Level 7;
Roof Slope: 10-40%;
Wall & Roof: Single Metal Sheet/ Thermal Insulation;
Design Service: Auto CAD, Tekla, Bkbm, Solidworks;
Door: Sliding Door/ Auto Uprolling Door;
Window: Aluminum Alloy/ Plastic Steel;
Tolerance: +-2mm;
Lead Time: 30 Days;
Insulation: EPS, Glasswool, Rockwool, Polyurethane;
Material: Steel Structure;
Customized: Customized;
After-sales Service: 24 Hours Around Clock;
Warranty: 10 Years;
|
After-sales Service: 24 Hours Around Clock;
Layers: Single-Layer;
Usage: Dust-Proof Workshop, Electrostatic Workshop, Food And Chemical Industry, Heavy Industry, High-Voltage Power Plant, Research Facility, Specialized Workshop, Textile And Electronic Processing, Warehouse;
Surface Treatment: Painting or Hot DIP Galvanized;
Life Span: Min.50 Years;
Wind Load: 285km/H 180m/S;
Snow Load: 10-100kg/Sqm;
Seismic Load: Level 7;
Roof Slope: 10-40%;
Wall & Roof: Single Metal Sheet/ Thermal Insulation;
Design Service: Auto CAD, Tekla, Bkbm, Solidworks;
Door: Sliding Door/ Auto Uprolling Door;
Window: Aluminum Alloy/ Plastic Steel;
Tolerance: +-2mm;
Insulation: EPS, Glasswool, Rockwool, Polyurethane;
Material: Steel Structure;
|