| Specification |
After-sales Service: Online Technical Support, Onsite Installation, Ons;
Grade: Q355 Q235;
Life Time: 50years;
Wall&Roof Panel: Steel Sheet or Sandwich Panel;
Doors: Roller up Door, Sliding Door and Others;
Purlin: C.Z Shape Steel Channel;
Application Fields: Steel Structural Fabrication Construction;
Project Solution Capability: Graphic Design, 3D Model Design, Total Solution Fo;
Design Style: Modern;
Key Words: Steel Structure Warehouse;
Use: Wareshouse;
Surface Treatment: Hot DIP Galvanised or Painted;
Model Number: Workshop Building;
Size: Customized;
Connected Method: Bolt;
Warranty: 1 Year;
Material: Steel Structure;
Usage: Warehouse, Workshop;
Customized: Customized;
|
After-sales Service: 2D &3D Installation Drawing& Install Video;
Connection Form: Bolt Connection;
Construction Member: Steel Column & Rafter,Purlin ,Tie Beam etc;
Grade: Quality Carbon Structural Steel And Alloy Structural Steel;
Molding Method: Hot Rolled or Weld;
Residential Wall Structure: Wall Support;
Standard: GB,as,En1090,ASTM;
Steel Type: High-Strength Steel;
Structure: Steel Structure;
Install: Online Guidance;
Mobility: Adjustable;
Usage: Steel Structure Warehouse;
Drawing: Free Design Drawing, 2D& 3D Version;
Wind,Snow,Earthquake Resistance: 80~280km/H, 30~200kg/M2, Grade 9;
Frame: Steel Portal Frame Building;
Roof Pitch: 10%, 12%, 16%, 25%, 30%etc;
Bay: 5m, 6m, 7, 9m etc;
Column & Rafter: Hot Rolled H Beam or I Beam;
Tie Beam: Round Pipe or Square Tube;
Purlin: C Purlin, Z Purlin, Hot Rolled H Beam Purlin;
Roof & Wall Coverage: Single Corrugated Sheet or Sandwich Panel;
Window: PVC or Aluminum Alloy Frame Window;
Gate: Sliding Industrial Door or Roller Shutter Door;
|
After-sales Service: Free Online After-Sale Service;
Connection Form: Bolt Connection;
Construction Member: Steel Beam and Column;
Grade: Quality Carbon Structural Steel And Alloy Structural Steel;
Molding Method: Hot-Rolled Steel;
Residential Wall Structure: Wall Support;
Standard: ISO, CE, BV, En, SGS;
Steel Type: H-Section Steel;
Structure: Steel Structure;
Company Nature: Public Company;
Delivery Time: Normally 30-45 Days After Shop Drawing Approved;
Forming: Hot-Rolled Steel;
Surface Treatment of Steel Structure: Painted or Galvanized;
Software: CAD, Tekla, Sketchup, Pkpm, Bim;
Quality Certificated: CE ISO9001:2000 SGS GB, ISO BV;
Material Grade: Q345/Q355;
Goods Characteristics: Warehouse/Workshop/Shed;
Product Name: Construction Prefabricated Steel Structure Warehou;
Performance: Safety, Water-Proof, Sound Insulated, Hear-Preserv;
Function: Storage Type Stereoscopic Warehouse;
Application: Steel Workshop, Steel Fabricated House, Structural;
Type of Steel for Building Structure: H-Section Steel;
Main Steel Frame: H Steel, Z or C Purlin;
|
After-sales Service: 2D &3D Installation Drawing& Install Video;
Connection Form: Bolt Connection;
Construction Member: Steel Column & Rafter,Purlin ,Tie Beam etc;
Grade: Quality Carbon Structural Steel And Alloy Structural Steel;
Molding Method: Hot Rolled or Weld;
Residential Wall Structure: Wall Support;
Standard: GB,as,En1090,ASTM;
Steel Type: High-Strength Steel;
Structure: Steel Structure;
Install: Online Guidance;
Mobility: Adjustable;
Main Structure: Weld or Hot Rolled H Section Beam;
Purlin: C Section or Z Section Steel;
Frame: Steel Portal Frame Building;
Roof Pitch: 10%, 12%, 16%, 25%, 30%etc;
Bay: 5m, 6m, 7, 9m etc;
Tie Beam: Round Pipe or Square Tube;
Roof & Wall Coverage: Single Corrugated Sheet or Sandwich Panel;
Gate: Sliding Industrial Door or Roller Shutter Door;
Window: PVC or Aluminum Alloy Frame Window;
Option: Skylight Belt, Ventilation Fitting, Gutter, Crane;
Delivery Time: 4~6 Weeks;
Forming: Hot-Rolled Steel;
|
After-sales Service: Installation Drawing, Installation Video;
Connection Form: Bolt Connection;
Construction Member: Steel H Column, H Beam, Purlin, Tie Beam, Coverage;
Grade: Quality Carbon Structural Steel And Alloy Structural Steel;
Molding Method: Hot-Rolled Steel;
Residential Wall Structure: Wall Support;
Standard: GB, ISO, SGS, BV, En1090 Exc2;
Steel Type: High-Strength Steel;
Structure: Steel Structure;
Drawing: Free Design Drawing, 2D& 3D Version;
Wind,Snow,Earthquake Resistance: 80~280km/H, 30~200kg/M2, Grade 9;
Frame: Steel Portal Frame Building;
Delivery Time: 4~6 Weeks;
Roof Pitch: 10%, 12%, 16%, 25%, 30%etc;
Bay: 5m, 6m, 7, 9m etc;
Column & Rafter: Hot Rolled H Beam or I Beam;
Tie Beam: Round Pipe or Square Tube;
Purlin: C Purlin, Z Purlin, Hot Rolled H Beam Purlin;
Roof Coverage: Single Corrugated Sheet or Sandwich Panel;
Wall Coverage: Single Corrugated Sheet or Sandwich Panel;
Window: PVC or Aluminum Alloy Frame Window;
Gate: Sliding Industrial Door or Roller Shutter Door;
|