| Specification |
Application: Fastener, Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory;
Standard: GB, EN, China GB Code, JIS Code, TEMA, ASME;
Surface Treatment: Anodizing;
Production Type: Single Production;
Machining Method: CNC Machining;
Material: Nylon, Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron;
Customized: Customized;
Precision: Precision;
Spare Parts: Spare Parts;
CNC Machining: CNC Machining;
|
Application: Fastener, Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory;
Standard: GB, EN, China GB Code, JIS Code, TEMA, ASME;
Surface Treatment: Polishing;
Production Type: Mass Production;
Machining Method: CNC Machining;
Material: Nylon, Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron;
Hardness: 20-70;
Surface Roughness: 0.4-3.2;
Heat-Treatment: Available;
Delivery: 10-15days;
Sample: Available;
Capacity: 10000PCS/Month;
QC: 100% Inspection;
MOQ: 1PC;
Transport: Express, Ship;
Type: OEM, ODM;
|
Application: Fastener, Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory;
Standard: GB, EN, China GB Code, JIS Code, TEMA, ASME;
Surface Treatment: Polishing;
Production Type: Mass Production;
Machining Method: CNC Machining;
Material: Nylon, Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron;
Hardness: 20-70;
Surface Roughness: 0.4-3.2;
Heat-Treatment: Available;
Delivery: 10-15days;
Sample: Available;
Capacity: 10000PCS/Month;
QC: 100% Inspection;
MOQ: 1PC;
Transport: Express, Ship;
Type: OEM, ODM;
|
Surface Treatment: Anodizing;
Production Type: Batch Production;
Machining Method: CNC Milling;
Quantity: 1 PCS +;
Color: Silver, Golden, Red, Green,Blue etc.,;
Delivery Time: 1 Week-4 Week;
Payment: T/T, Net 30 Days;
|
Application: Fastener, Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory;
Standard: GB;
Surface Treatment: Polishing;
Production Type: Batch Production;
Machining Method: CNC Turning;
Material: Nylon, Steel, Plastic, Brass, Alloy, Copper, Aluminum;
Quantity: 1 PCS +;
Color: Silver, Golden, Red, Green,Blue etc.,;
Delivery Time: 1 Week-4 Week;
Payment: T/T, Net 30 Days;
|