| Specification |
Warranty: 1 Year;
Type: Sofa Fatigue Tester;
Maxcapacity: <1000KN;
Accuracy Grade: 0.5;
Load Way: Electronic Load;
Loading Method: Dynamic Load;
Display: Digital;
Control: Computer Control;
Weight: 500-1000Kg;
Power Source: AC220V;
Warranty Period: 1 Year;
Technology: Professional;
Seat Load: 750 N;
Backrest Load: 400n;
Timer: 0~999,999;
Cyclic and Holding Time: 0 ~ 99.9s;
Controller: LCD Color Touch Screen Programmable Controller;
Power: AC220V,50Hz;
Specimen Size: (L*W*H) About 2200*1200*1200mm;
Air Source: 7kg/ Cm 2;
|
Type: Strength Testing Machine;
Accuracy Grade: 0.2;
Display: LCD;
Weight: 10kg;
Power Source: AC220V;
Transformer Ratio: 1--10000;
Group: 1--12 Point (12 Vector Groups);
Environment Temperature: -5--40;
Humidity: <85%;
Standard: IEC;
Warranty: 1 Year;
|
After-sales Service: Life Long Support;
Warranty: 1 Year;
Type: Transformer Oil Tester;
Baseline Noise: ≤2 *10-13A;
Linear: >106;
Sensitivity: >5000mv Ml / Mg;
Baseline Drift: ≤100μV / 30min;
Product Name: Transformer Oil Dissolved Gas Analyzer;
|
After-sales Service: Suppor for Lifelong;
Warranty: 1 Year or Extend;
Type: Gc Analyzer;
Power Source: AC220V;
Baseline Noise: ≤2 *10-13A;
Linear: >106;
Sensitivity: >5000mv Ml / Mg;
Baseline Drift: ≤100μV / 30min;
Product Name: Transformer Oil Dissolved Gas Analyzer;
Gas Detected: H2, O2, Co, CO2, CH4, C2h2, C2h4 and C2h6;
Qualitative Repeatability: Deviation ≤ 1%;
Quantitative Repeatability: Deviation ≤ 3%;
Indexes of Detector 1: Fid;
Indexes of Detector 2: Tcd;
Indexes of Detector 3: Ecd;
Indexes of Detector 4: Fpd;
Nick Name: Gc Analyzer;
Standard: IEC;
|
After-sales Service: Life Long Support;
Warranty: 1 Year or Extend;
Type: Impulse Voltage Generator;
Display: Digital;
Control: Computer Control;
Power Source: AC220V;
Product Name: Impulse Voltage Generator;
Waveform 1: Si;
Wavform 2: L1;
Waveform 3: LC;
Waveform 4: Steep Voltage Waveform;
Waveform 5: Customzied Waveform;
Voltage: 100kv, 200kv, 300kv, 400kv,600kv,800kv, 1200kv etc;
Energy: 5kj,10kj,15kj,20kj,30kj,80kj ,etc;
Test Sample: Transformer, Insulator, Circuit Breaker;
Lead Time: 25~30 Working Days;
Standard: IEC;
Calibration Report: Support The Third Party;
|