Key Features: The Hot Rolled Tie Rod, a key component of the Concrete Formwork Tie Rod System, is made of special mixture steel, with a diameter of DW15mm, weighing 1.40kg/meter, and an ultimate load of 180kn-190kn. It features a galvanized or natural surface finish and is SGS certified. OEM designs and sizes are acceptable, and the system is widely used in various concrete formwork applications.
Supplier Highlights: TRICO, established in 2002, is an expert in formwork and scaffolding, offering a "1+N" one-stop service mode. The company's products are sold in over 90 countries and regions globally, backed by a commitment to quality control and 24-hour online consulting services.